Marine Corps Logistics Base, Central Repair Shop

Marine Corps Logistics Base, Central Repair Shop

Albany, GA
As-built structural analysis and design for the replacement of the existing 35 and 75 ton bridge cranes with 100 ton bridge cranes and the addition of (30) 3 ton jib cranes to the center crane runway support columns. The crane runway beams and supporting columns required replacement, and the foundations required enlargement. Additional challenges faced on project included HTRW remediation in the soil and superstructure.

Categories